&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
wear resistant coatings > circulating pump silicon carbide wearing compound coating

circulating pump silicon carbide wearing compound coating

circulating pump silicon carbide wearing compound coating
BD772 slurry recycle pump epoxy repair wearing compound anti abrasion corrosion chemical resistant coating

product description:
BD772 silicon carbide coating is the high performance wear resistant,corrosion resistant polymeric material compounded by the
high performance abrasion resistant,anti corrosive materials--highest crystallizing silicon carbide and modified toughening hybrid resin.
Mainly used in the wear repairing and pre-protecting of slurry circulating pump impeller,body case,slurry stirring paddle etc.
 
product features of BD772 silicon carbide particle desulfuration slurry circulating pump epoxy repair anti cororsion
abrasion wearing chemical resistnt coatings:

1.With excellent wear & corrosion resistance,suitable for the protection of abrasion,corrosion working condition)
2.With very high bonding strength to metal substrates
3.Don’t drip and slip,the construction is convenient                          
4.Don’t precipitate,don’t  separated layer
5.water resistant,acid resistant,alkali resistant                                
6.Can do the machining
 
Product index:
product name physical status operation time limit
(25¡æ)
usable time
(25¡æ)
        range of application
BD772 silicon carbide coatings paste 30min 24h Mainly used in the abrasion repairing and pre-protecting of slurry circulating pump impeller,body case,slurry stirring paddle etc.
color density
(g/cm3)
compressive strength
(Mpa)
GB1041-2008
tensile strength
(Mpa)
GB6329-1999
shear strength
(Mpa)
GB7124-2009
bending strength
(Mpa)
GB1042-2008
hardness after curing
£¨Shore D£©
ASTM-D-2556
working temperature
£¨¡æ£©
gray 2.1 118 47 11 66 83 -60¡«120
 
How to use:
1.Surface treatment: Do coarsening treatment on the pending-repair area, grinding with angle grinder or sand blasting and so on,
the surface after coarsening treatment should be cleaned,the surface after this treatment should be the one coarsening,dry and
fresh substrates,should be no greasy dirt and dust.
 
2.Preparation:According to the mixing weight ratio A:B=5:1, make A and B two components of BD772 silicon carbide coatings
mix uniformly,and use it up within 30 min.Generally it’s while construction and configuration.Every time the most configuration
quantity is not more than 2Kg,too much adhesive is solidified too fast,hasn’t been used up until partial adhesive has solidified and
can’t be used.According to the actual temperature,configuration can be appropriately a little more in winter,proper less in summer.
If the temperature is too low,you can properly heat up the A component to reduce viscosity for easy to configure.
 
3.Coating: the suitable coating thickness of BD772 silicon carbide coatings is 2-15mm,the most thickness can be 30mm.
Make the mixed-up material spread coating on the pending-repair area layer by layer, the first layer should be compacted,
make it infiltrate fully with the substrates.Repair the surface to be smooth after the coating is coated in the suitable size,
or use low viscosity abrasion resistant adhesives to smear the surface of the coatings.This material can do machining,
if there is out of tolerance,you can do milling and grinding process.
 
4.Curing: It can be put into using after curing for 24 hours at the temperature of 25 degree.When the temperature is below 15 degree,
the coatings can’t cure completely,should heat it up to the temperature of 80¡æ and keep this temperature for 2 hours to promote the
coatings fully curing after the coating initial curing (can use the iodine tungsten lamp to do irradiation heating with 40cm distance
from the coating.
     
Packaging specification:
Our common packaging:Two-component,10kg/group,packed in a plastic drum,mixing weight ratio A:B=5:1
We could offer professional customized packaging and sub-package services based on users' requirements.
 
Transportation and storage:
Sealed storage in the cool and dry place. The warranty period is 12 months.
Avoid placing it upside down, knocking against and transporting it as a non-dangerous product during transportation.
 
Special version:
1.This parameter is for laboratory conditions,due to the actual working condition is more complex,suggest the users to do the
pretest according to actual working condition.

2.When the environment temperature is below 15¡æ,the curing time will prolong,should take proper heating measure.

3.When the environment temperature is more than 25¡æ or the mixing quantity is too large,the curing speed will expedite,
should properly shorten the application time of coating after mixing.
 
Construction protective measures:
1.Wear the protective masks,wear the protective glasses and rubber gloves
2.Need washing hands with soap before eating,drinking or smoking.
3.The health hazard after touching: a few people will have skin allergy phenomenon,see a doctor in time and avoid touching with
this product again.should wipe it with ethyl acetate when the sizing material paste on the skin by careless,then wash it with clear water.
Should wash it with clear water immediately and see a doctor when splashing into the eyes by careless.
 
Warm Prompt:
Residual adhesive solution cured products are non-toxic harmless organic solid,but maybe it will produce poisonous gas when
burning,non-professional personnel can not do combustion disposal,should be sent to garbage power plant or garbage burning
place treatment.
 
Fire prevention measures:
Should choose dry powder to extinguish fire,can cover and flap it with dry powder,grit(the construction using abrasive) or the
non chemical fiber fabric when the sizing material catching fire.


Zhengzhou Yuzhong Energy slurry recycle pump repairing construction case from link:
http://www.wearcoating.com/case-of-desulfuration-pipeline-repairing-coatings/slurry_circulating_pump_wear_repair_compound_epoxy_coating_4456.html

Hubei Huadian Power Plant slurry circulating pump repairing construction case from link:
http://www.wearcoating.com/case-of-desulfuration-pipeline-repairing-coatings/slurry_recycle_pump_impeller_anti_wear_repair_epoxy_coating_4469.html


Datang Togtoh Power Plant slurry recycle pump repairing construction case from link:
http://www.wearcoating.com/case-of-desulfuration-pipeline-repairing-coatings/slurry_recycle_pump_anti_wear_abrasion_resistant_coating_4457.html

China Resources Power Plant slurry circulating pump repairing construction case from link:

http://www.wearcoating.com/case-of-desulfuration-pipeline-repairing-coatings/recycle_pump_impeller_ceramic_rubber_lining_epoxy_coating_4472.html

Rizhao Steel Sintering Plant slurry recycle pump repairing construction case from link:
http://www.wearcoating.com/case-of-desulfuration-pipeline-repairing-coatings/slurry_recycle_pump_wear_corrosion_resistant_repair_coating_4474.html


Product packaging actual photo of BD772 silicon carbide ceramic particle slurry circulating pump epoxy repair
wearing compound anti abrasion chemical corrosion resistant coating:


 
 
                                 
 
                                                                  
                                                                  
                                       

------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337